16-Mar-12
|
THE CONSTRUCTION AND COMPLETION OF THE PROPOSED NEW WATER TREATMENT PLANT, RESERVOIR AND ASSOCIATED FACILITIES OF THE PROPOSED SAMALAJU WATER SUPPLY (PHASE 1 STAGE 2), BINTULU DIVISION (P1S2) - SAMALAJU
|
02-May-14
|
THE CONSTRUCTION AND COMPLETION OF THE PROPOSED NEW WATER TREATMENT PLANT, RESERVOIR AND ASSOCIATED FACILITIES OF THE PROPOSED SAMALAJU WATER SUPPLY (PHASE 1 STAGE 3A), BINTULU DIVISION (P1S3A) - SAMALAJU
|
29-Sep-14
|
CADANGAN PEMBINAAN KAMPUS WILAYAH SARAWAK INSTITUT TADBIRAN AWAM NEGARA (INTAN) DI ATAS SURVEI LOT 5452 , BLOCK 26 , MTLD JLN DATUK MOHD. MUSA ,KOTA SAMARAHAN ,SARAWAK . - FASA II PAKEJ 2B -LUKISAN KERJA SSB,ESSB ,SB,ESB AND FEEDER PILLAR
|
12-Jan-15
|
BEKALAN AIR MUKAH BAHAGIAN MUKAH SARAWAK PHASE 2 PACKAGE 1: PROPOSED UPGRADING EXISTING WATER TREATMENT PLANT AND ASSOCIATED FACILITIES (PH2P1) - MUKAH
|
12-Jan-15
|
BEKALAN MUKAH BAHAGIAN MUKAH SARAWAK PHASE 2 PACKAGE 1 :PROPOSED UPGRADING OF EXISTING WATER TREATMENT PLANT AND ASSOCIATED FACILITIES (PH2P1) - MUKAH
|
11-Dec-15
|
CADANGAN UNIVERSITI TEKNOLOGI MARA (UiTM), KAMPUS MUKAH, DI ATAS SEBAHAGIAN LOT 35, BLOK 99, MUKAH LAND DISTRICT, MUKAH DIVISION, SARAWAK
|
22-Feb-16
|
THE CONSTRUCTION AND COMPLETION OF THE PROPOSED ROAD NETWORK AND DRAINAGE SYSTEM FOR SAMALAJU NEW TOWNSHIP ,BINTULU DIVISION SARAWAK, STREET LIGHTING DETAILS (2)
|
23-Feb-16
|
PROPOSED UPGRADING OF TINGKAS INTAKE PUMPING SYSTEM & ASSOCIATED FACILITIES INCLUDING RAW WATER PUMPING MAIN FROM TINGKAS INTAKE TO PENAKUP (MUKAH WATER SUPPLY - PHASE 2 PACKAGE 2) (PH2P2) - MUKAH
|
27-Apr-16
|
PROPOSED NEW DEWAN SERBAGUNA SMK KOTA SAMARAHAN
|
04-May-16
|
CONSTRUCTION AND COMPLETION OF THE PROPOSED ONE BLOCK GOAT SHED AT BAKO ANIMAL QUARANTINE STATION,JALAN BAKO KUCHING DIVISION
|
26-May-16
|
PROPOSED SITE INVESTIGATION SURVEY, DESIGN, SUPPLY, DELIVERY, CONSTRUCTION , COMPLETION INCLUDING TESTING & COMMISSING OF SUNGAI ASAP WATER SUPPLY BAKUN BAHAGIAN KAPIT SARAWAK
|
26-Jul-16
|
PROPOSED UPGRADING OF TINGKAS INTAKE PUMPING SYSTEM & ASSOCIATED FACILITIES INCLUDING RAW WATER PUMPING MAIN FROM TINGKAS INTAKE TO PENAKUP (MUKAH WATER SUPPLY - PHASE 2 PACKAGE 2) (PH2P2) - MUKAH
|
29-Aug-16
|
BATANG TRUSAN BRIDGE ELECTRICAL INSTALLATION
|
14-Oct-16
|
PROPOSED CONSTRUCTION & COMPLETION OF KLINIK KESIHATAN STUNGKOR AT STUNGKOR LUNDU SARAWAK
|
21-Oct-16
|
CHEMICAL HOUSE INSTRUMENT PANEL LAYOUT EXTERNAL FRONT VIEW _BEKALAN AIR MUKAH BAHAGIAN MUKAH SARAWAK PHASE 2 PACKAGE 1 PROPOSED UPGRADING OF EXISTING WATER TREATMENT PLANT AND ASSOCIATED FACILITIES
|