Tenaga Kenari Group
slogan slogan_02
PROJECT REFERENCE
Jabatan Kerja Raya (JKR)
  
JKR Project List
  
JKR Project List
Untitled Document


JKR Project List


Brief Description

 

JABATAN KERJA RAYA ( JKR ) PROJECT

16-Mar-12

THE CONSTRUCTION AND COMPLETION OF THE PROPOSED NEW WATER TREATMENT PLANT, RESERVOIR AND ASSOCIATED FACILITIES OF THE PROPOSED SAMALAJU WATER SUPPLY (PHASE 1 STAGE 2), BINTULU DIVISION (P1S2) - SAMALAJU

02-May-14

THE CONSTRUCTION AND COMPLETION OF THE PROPOSED NEW WATER TREATMENT PLANT, RESERVOIR AND ASSOCIATED FACILITIES OF THE PROPOSED SAMALAJU WATER SUPPLY (PHASE 1 STAGE 3A), BINTULU DIVISION (P1S3A) - SAMALAJU

29-Sep-14

CADANGAN PEMBINAAN KAMPUS WILAYAH SARAWAK INSTITUT TADBIRAN AWAM NEGARA (INTAN) DI ATAS SURVEI LOT 5452 , BLOCK 26 , MTLD JLN DATUK MOHD. MUSA ,KOTA SAMARAHAN ,SARAWAK . - FASA II PAKEJ 2B -LUKISAN KERJA SSB,ESSB ,SB,ESB AND FEEDER PILLAR

12-Jan-15

BEKALAN AIR MUKAH BAHAGIAN MUKAH SARAWAK PHASE 2  PACKAGE 1: PROPOSED UPGRADING EXISTING WATER TREATMENT PLANT AND ASSOCIATED FACILITIES  (PH2P1) - MUKAH

12-Jan-15

BEKALAN MUKAH BAHAGIAN MUKAH SARAWAK PHASE 2 PACKAGE 1 :PROPOSED UPGRADING OF EXISTING WATER TREATMENT PLANT AND ASSOCIATED FACILITIES (PH2P1) - MUKAH

11-Dec-15

CADANGAN UNIVERSITI TEKNOLOGI MARA (UiTM), KAMPUS MUKAH, DI ATAS SEBAHAGIAN LOT 35, BLOK 99, MUKAH LAND DISTRICT, MUKAH DIVISION, SARAWAK

22-Feb-16

THE CONSTRUCTION AND COMPLETION OF THE PROPOSED ROAD NETWORK AND DRAINAGE SYSTEM FOR SAMALAJU NEW TOWNSHIP ,BINTULU DIVISION SARAWAK, STREET LIGHTING DETAILS (2)

23-Feb-16

PROPOSED UPGRADING OF TINGKAS INTAKE PUMPING SYSTEM & ASSOCIATED FACILITIES INCLUDING RAW WATER PUMPING MAIN FROM TINGKAS INTAKE TO PENAKUP (MUKAH WATER SUPPLY - PHASE 2 PACKAGE 2) (PH2P2) - MUKAH

27-Apr-16

PROPOSED NEW DEWAN SERBAGUNA SMK KOTA SAMARAHAN

04-May-16

CONSTRUCTION AND COMPLETION OF THE PROPOSED ONE BLOCK GOAT SHED AT BAKO ANIMAL QUARANTINE STATION,JALAN BAKO KUCHING DIVISION

26-May-16

PROPOSED SITE INVESTIGATION SURVEY, DESIGN, SUPPLY, DELIVERY, CONSTRUCTION , COMPLETION INCLUDING TESTING & COMMISSING OF SUNGAI ASAP WATER SUPPLY BAKUN BAHAGIAN KAPIT SARAWAK

26-Jul-16

PROPOSED UPGRADING OF TINGKAS INTAKE PUMPING SYSTEM & ASSOCIATED FACILITIES INCLUDING RAW WATER PUMPING MAIN FROM TINGKAS INTAKE TO PENAKUP (MUKAH WATER SUPPLY - PHASE 2 PACKAGE 2) (PH2P2) - MUKAH

29-Aug-16

BATANG TRUSAN BRIDGE ELECTRICAL INSTALLATION

14-Oct-16

PROPOSED CONSTRUCTION & COMPLETION OF KLINIK KESIHATAN STUNGKOR AT STUNGKOR LUNDU SARAWAK

21-Oct-16

CHEMICAL HOUSE INSTRUMENT PANEL LAYOUT EXTERNAL FRONT VIEW  _BEKALAN AIR MUKAH BAHAGIAN MUKAH SARAWAK PHASE 2 PACKAGE 1 PROPOSED UPGRADING OF EXISTING WATER TREATMENT PLANT AND ASSOCIATED FACILITIES

 

 

 

 

 

 

 
Description
 
Featured
 
 
Designed by Web and You.